Skip to content
Knowledge Base/ Laboratory and quality control/ QC contingency package - Backup

QC contingency package - Backup

Learn when to choose the QC Intervention Package - Backup when working with challenging material or when its quality cannot be assessed in advance.

CATEGORY
NGS services
PROJECT STAGE
04 · Laboratory and Quality Control
READING TIME
1 min
LAST UPDATED
29 January 2024
PREPARED BY
weSEQ.IT Technical Team
Get a quote

The QC Intervention Package makes it possible to plan a project even when working with challenging material or when the client has limited capacity to verify sample quality before shipment.

The QC Intervention Package includes:

• The option to submit up to 20% more samples for QC analysis than specified in the order (for example, up to 5 additional samples for an order of 24 samples).

• The option to review the QC results and then decide which samples, up to the maximum number specified in the order (for example, 24), should proceed to library preparation.

IMPORTANT

The client will not be charged for QC analysis of the additional samples or any handling fees if no further analysis is requested for samples representing no more than 20% of the order (for example, 5 samples in an order of 24).

We particularly recommend this package for clients who cannot verify the quality of their material before shipment or who frequently encounter difficulties obtaining high-quality material.

To add this package to your order, please contact your Account Manager at contact@weseq.it.

KEYWORDS
Intervention PackageQC backupadditional QC samplesbackup sampleschallenging material20% more samplesproject risk mitigationquality control of additional samples
Was this article helpful?
Your feedback helps us improve the knowledge base.

Looking for another article?

Back to all topics →

Can't find an article answering your question?

Contact us - we will answer your question and add it to the knowledge base.